Since 2016 the more than 40 year-old suspension railway carriages of The class 1972 are removed by new trains. 122 million euros are used for it, a project by the company Vossloh Kiepe as a general enterpriser is moved. 31 new vehicles are planned in whole Europe, are developed and built. Production beginning was the final assembly of the vehicle boxes and in November, 2013 the powered chassis then happens in the workshop inVohwinkel. Are all vehicles is exchanged the train protection on ETCS (European Train Control system) moved.
On the 14. 11. 2015 around 11:15 the truck with the front part of the GTW 1 reached the imperial place in Vohwinkel. Numerous visitors could hardly expect it to welcome the new generation of the suspension railway.
A few facts to the new train :
Train length / width: | 24m / 2,20m |
---|---|
Weight of the new carriage boxes: | 5,4 t |
Weight of the bogies: | 12,5 t |
Impulse: | Three-phase current engines with back supply of the brake energy |
Operating voltage: | 750 V |
Maximum speed : | 65 km/h admitted for 60 km/h |
Passengers: | 45 seat places and 96 standing places |
Max. Train result : | 2-minutes tact |
The first test journey took place at night from 8. to the 9th of February on a section in Vohwinkel, at night from 23. to the 24th of February the GTW 1 drove on first the whole distance.
GTW 1
GTW 2
GTW 3
GTW 4
GTW 5
GTW 6
GTW 7
GTW 8
GTW 9
GTW 10
GTW 11
GTW 12
GTW 13
GTW 14
GTW 15
GTW 16
GTW 17
GTW 18
GTW 19
GTW 20
GTW 21
GTW 22
GTW 23
GTW 24
GTW 25
GTW 26
GTW 27
GTW 28
GTW 29
GTW 30
GTW 31
Bei dieser Seite handelt es
sich um eine private Homepage.